Safe Isolation Starts Before You Touch the Board

The hardest part of safe isolation is not always the tester. Sometimes it is the customer asking, ‘How long will you be?’ The manager saying, ‘Can we keep that bit live?’ The lost day’s pay if you walk away.

This site is a practical learning hub for planning, communicating and carrying out safe electrical isolation in the real world.

Explore the 10-point check. Learn the language. Practise the scenarios. Share the near misses.

Permit pre-conditions

The real job starts before the tools come out

Safe isolation begins at booking — permission, expectations and authority — not when you arrive with a tester. These are the boxes that must be ticked before a single cover comes off.

  • Permission granted. The person in charge of the premises has agreed to the supply being switched off.
  • Expectations set. Everyone affected knows roughly how long, and what stays off.
  • Authority to isolate.You — not the customer — control the point of isolation.
  • A clear walk-away.An agreed answer for when the conditions for safe work aren’t there.
Hold points

Real-world pressure interrupts the procedure

  • Customer

    Can I just finish this meeting?

  • Site manager

    How long will this take?

  • Tenant

    The freezer is full.

  • Business owner

    We can’t shut down card payments.

  • Engineer

    I’ve driven four hours to get here.

Every technical step happens inside a human situation. Pressure changes decisions.

10-point check

Prove dead. Stamp every test.

The full three-phase sequence, in order, against an approved test instrument. Each line is signed off only when it reads dead.

Form SI / 10

Proving Dead — Test Schedule

0 / 10 verified

  1. 01L1 – L2pending
  2. 02L1 – L3pending
  3. 03L2 – L3pending
  4. 04L1 – Earthpending
  5. 05L2 – Earthpending
  6. 06L3 – Earthpending
  7. 07L1 – Neutralpending
  8. 08L2 – Neutralpending
  9. 09L3 – Neutralpending
  10. 10Neutral – Earthpending

These ten tests sit inside the wider procedure — plan, permit, identify, isolate, lock off, prove, test, re-prove. The ten checks are not the whole job.

Pinned to the board

A learning resource, not a replacement for official guidance.

  • IET
  • HSE
  • Electrical Safety First
  • NAPIT
  • NICEIC
  • BS 7671
  • Electricity at Work Regs
  • GS38
  • HSG85
  • IET On-Site Guide
Near-miss report

A refused isolation is a safety signal, not just a scheduling problem.

If the worker loses money every time they choose safety, the system is quietly rewarding risk.

Submit a near miss

The safest electrician is not the one who can work around every obstacle. It is the one who sees the pressure coming early enough to control it.

This website is for education, discussion and professional development. Always follow current regulations, manufacturer instructions, employer procedures, site rules and official guidance. Safe isolation must be carried out by competent persons using suitable equipment and an appropriate risk assessment.